Linesight

Senior Project Manager - Data Centre Construction

Job Locations IE-Dublin-Dublin
Job ID
2025-2950
# of Openings
1
Skillset
Project Management
Position Type
Permanent Full-Time

Overview

As a Senior Electrical Project Manager at Linesight, you will work with highly experienced, culturally diverse, and passionate teams nurturing a strong social dynamic and a shared sense of achievement. You will gain vast industry experience that will open doors for you, extend your skillset and expand your perspective. We will empower, support, and enable you to take real responsibility in your role so that you can take charge of your career progression with us. You will be mentored and supported by industry leaders and given the tools to grow. You will also be involved in and contribute to our business strategy as we continue to evolve. For us lasting trusted relationships are everything, both with our teams and our clients. 

The Opportunity

In this role you will:

  • Lead the delivery of a large-scale data centre construction project in Dublin, with a focus on electrical power systems, including switchgear and substation installations.

  • Act as a visible leader onsite, ensuring progress is maintained and that all work is executed safely and in accordance with project specifications.

  • Coordinate closely with the client team, consultant team, and contractors to manage snagging activities, ensuring timelines are met and quality standards are upheld.

  • Proactively identify issues related to electrical power systems and collaborate with stakeholders to implement effective solutions.

  • Implement and monitor key project processes, particularly those related to electrical installations, making improvements and revisions where necessary to optimise project outcomes.

  • Lead and attend key project meetings, providing technical input on electrical systems and ensuring progress is accurately reported to all stakeholders.

  • Oversee the commissioning of switchgear, substations, and related electrical infrastructure, ensuring compliance with relevant standards and client requirements.

  • Ensure project documentation and procedures are implemented, maintained, and adhered to throughout the lifecycle of the project.

We would love to hear from you if you:

  • Have proven experience as a Project Manager on data centre or large-scale industrial projects, with specific expertise in electrical power systems, including switchgear and substations.

  • Possess a recognised project management professional certification (e.g., PMP, PRINCE2) or are actively working towards one. We can provide support to help you achieve this.

  • Hold a degree in Electrical Engineering, Project Management, or a related construction discipline, or have equivalent experience.

  • Demonstrate a strong understanding of electrical power infrastructure, including HV/LV systems, switchgear, transformers, and substation design.

  • Are detail-oriented and focused on delivering high-quality outcomes, with a proactive approach to problem-solving.

  • Have excellent communication skills, both verbal and written, and the ability to present technical information clearly to various stakeholders.

  • Enjoy building strong relationships with clients, contractors, and team members, fostering a collaborative working environment.

This is a fantastic opportunity to join a leading construction consultancy and work on a high-profile data centre project in Dublin. If you have a passion for electrical power systems and thrive in fast-paced, dynamic environments, we would love to hear from you.

 

All interviews are conducted either in person or virtually with video required.

About us

Linesight is a highly successful global project and cost management consultancy that keeps clients coming back. And for that we have our people to thank. You see we’re not like the others. We’re different. Unique. It’s our fresh thinking and focus on what matters that has led to our evolving. We are on a journey working in some of the most exciting innovative sectors with some of the world’s most prestigious companies delivering major projects that deliver a more sustainable built environment. We have an open culture and a flat structure where you can expect to be treated with genuine care, respect, and empathy. With Linesight, you can truly discover the power of team! 
 

Diversity, inclusion and accessibility   

Linesight is committed to transparent, equal opportunity employment practices. We are building a diverse and inclusive organisation, accessible to all, based on having a safe culture which enables all our people to be their true selves. We are a people business, and we understand that the more inclusive we are, the happier our people and better our work will be. We will ensure that individuals with disability are provided reasonable accommodation to participate in the application or recruitment process and are accommodated in the workplace. If you require assistance or accommodation of any kind, please mention this in your application, we would love to hear from you! 

Options

Sorry the Share function is not working properly at this moment. Please refresh the page and try again later.